I am going to make a 10x10x6 pyramid. I am pretty good to go on most of the seams/assembly. But, I am having a hard time deciding how to made the apex where the pole goes.
As far as I can tell the basic pyramid will stop short of the top. Then some reinforced material is sewed on (like cordura) and a silnylon cap over that to make it waterproof.
Am I heading in the right direction? How do I make the 4 sides of the cordura come together at the peak with the silnylon over it? I am stumped!
Thanks for any advice!

