Do you use a seperate ridge line and then attach the tarp to it or do you use lines off the webbing ties or grommets and then tension the tarp. I just got an Equinox 8×10 and I tie it using lines off the grommets for the ridge. It appeared to place a lot of strain on the grommets when the sides were staked out and it worried me that I might (over time) tear a grommet out. Also it seems to give more coverage when the 10 foot length is used as the ridge – but the 8 foot length has three attachment places in the body of the tarp that would be great for extra lift – am I doing this right?
Topic
Rigging a tarp – question
Become a member to post in the forums.
- This topic is empty.
Alvie,
Don't worry about the POSSIBILITY of tearing out a grommet. If you use the tarp in the wind it is a CERTAINTY unless the grommet was installed by a good sail maker.
Webbing loops sewn onto a reinforced tarp edge are much better.
But to answer the question you asked … full ridgeline under the tarp or separate guylines tied to the grommets? … I'm sure the gram weenies here use the second approach but I THINK the full ridgeline rope will help your ridgeline grommets last longer. But I'd still tie a short (12") piece to the grommets and to the ridgeline (tautline hitch) to keep the tarp stretched out along the ridgeline.
Become a member to post in the forums.

