PostedJan 14, 2008 at 9:49 pm

We used the Oware Pyramid tarp in the Sierra's this past weekend. We were at 9000 ft and gusts
of wind up to 20 mph. The pyramid tarp was great. We set it up as a kitchen to provide shelter
from the wind and snow. We first prepared the snow as you would for a quarry and then quarried
out the foot well and placed the blocks around the parameter for a wall and backrest. The tarp
was then set on the short wall. This is faster and easier than digging out the seating surface
and foot well. This setp easily accommodated 6 people in the group with room to spare. It was
extremely stable in the gusting winds. True luxury!

Quarry and site prep
site prep

Pyramid setup
Pyramid at sunset

Kitchen
Kitchen

Eating Sarah's Clam Chowder in comfort
eating

PostedJan 14, 2008 at 10:26 pm

Great shelter, and photos!!!

I've never built a tarp/snow shelter like that before, and may be the only one in these forums who's in the dark about the techniques you used. Would appreciate knowing how you go about forming blocks used to construct the wall.

Do you use a box, or something similar, as a mold in which to pack snow for each block? Or just stomp down an area of snow and then cut blocks from the packed down area?

JRS

Steven Evans BPL Member
PostedJan 15, 2008 at 5:11 am

That's a work of art! Having not built anything near as nice or complex as that, I would be curious to know how long it took.
Steve

PostedJan 15, 2008 at 8:30 am

It is a 10' x 10' x 6'pyramid made out of silicone coated nylon with a weight of 26 oz.

It is pretty fast to set up. Here is the time line…

Site prep ~ 15 min
Quarry setup time ~ 1 hour
Actual construction ~ 1 hour with 2 people.

PostedJan 15, 2008 at 10:43 pm

Hi Richard,

I looked around the web a little and didn't find anything that useful. One of the best books that you can buy to describe the techniques is "Revised and Even Better!" "Allen & Mike & Really Cool Backcountry Ski Book." Mike Clelland has great illustrations in it.

Basically, you stomp down an area to consolidate the snow. Wait 60 to 90 minutes for the snow to set up. Then using the snow saw, cut out uniform block to use for walls or igloos.

We used a Life Link Snow Saw to cut the blocks. It was the only one that REI carried at that time.

http://www.life-link.com/accessories.htm

Here are some other saws that also work great…

http://www.smcgear.net/products.asp?cat=4&pid=59
http://www.snowsaw.com/

Viewing 6 posts - 1 through 6 (of 6 total)
Loading...